The schedule on one page.
Visualize the project schedule. Put a large, complex schedule study on one page. See what was achieved and what moved, read the sequence, and walk into the SIMOPS session prepared.
- Present construction progress visually, in the meeting.
- Present the work sequence: foundations, steel structure, piping, equipment, cable pulling, instrumentation.
- Show the access dates between disciplines.
- Show the critical path, drawn on the plan.
- Present the schedule slips, with their reasons.
- Show a density study: schedule dates against resources.
- 1
Drop in the plot plan or the 3D view, and the schedule.
- 2
Mark the areas, drop activities onto them to link.
- 3
Export, or share the link.
Next update, refresh the schedule. The board stays.
A rich one-page board for the meeting, an A3 for the wall, a 4K export for the whole team. Built by the planner, read by everyone.
Primavera P6 does the heavy lifting: it builds the schedule and runs the maths. Its native views and printed exports run to dozens of pages, and rightly so. Presenting them is another job, with other tools, and even with spreadsheets and slides it costs days. With Smart Boards, or the 4K graphical view of Schedule Dynamics, the whole study fits on one page, with drag and drop and a few clicks.
Planners, schedulers, construction managers, supervisors: the whole execution team feeds the schedule, through different channels and in different formats. On one page from ploteer, the whole team reads the same picture, and the meeting moves faster. The effort that went into building and maintaining the schedule becomes visible.